Heat pump on Lake Zurich
Heat pump on Lake Zurich – planning, permits and installation
Would you like to switch from oil or gas to a heat pump in Küsnacht, Erlenbach, Meilen, Stäfa or Thalwil, or have your existing heat pump serviced? From our base in Adliswil we plan and install heat pumps on both shores of the lake and take care of maintenance – also for systems fitted by other installers.
- Over 15 years of experience in building services
- Service also for third-party systems
- Mon–Fri 07:00–17:30 · Sat 07:00–12:00

Example image from our existing photo gallery; not a local reference project.
By the lake, the plot and the neighbours determine the solution
For a heat pump in Küsnacht, Erlenbach or Stäfa we look not only at current consumption but also at the route to the boiler room, the possible location of the outdoor unit and the distances to the neighbours’ windows. If the plot is on a slope, access is narrow or there is little space for installation, we clarify these points before choosing the unit.
Where there is no suitable space for an outdoor unit, a ground-source heat pump with borehole probes can make sense. It works without an outdoor unit but requires drilling and a water protection permit. Whether an air-to-water heat pump can be installed indoors or outdoors depends on the building – we clarify this during the site visit.
On the left shore of the lake and on the Zimmerberg we are especially close: for Adliswil, Thalwil, Horgen, Kilchberg and Rüschlikon you will find details on the page Heat pump Adliswil & Zimmerberg.
Services
Our heat pump services
Advice
Which heat pump suits the house, the plot and the heat distribution?
Planning & sizing
Determine the heating load, size the heat pump, plan the location and pipe routing.
Notification & building permit
Compile and submit the documents for the building authority, including the noise protection certificate.
Installation & commissioning
Professionally installed, set up and explained to you. Electrical connection by the client.
Heating replacement
Remove the old system, install the heat pump – from a single source. The electrical connection is provided by the client.
Maintenance
Servicing and repair of existing heat pumps, including third-party systems.
Good to know in the Canton of Zurich
Since 1 January 2023, many heat pumps in the Canton of Zurich can be installed under the notification procedure: air-to-water heat pumps installed indoors, outdoor units up to 2 m³ in volume and ground-source heat pumps with borehole probes. If nothing else is ordered within 30 days, work can begin. In core zones and where townscape or monument protection applies, air-to-water heat pumps installed outdoors still require a permit (Source: Canton of Zurich (in German)).
Air-to-water heat pumps always require a noise protection certificate in line with the Cercle Bruit enforcement practice (Source: Canton of Zurich (in German)).
When the heat generator is replaced in existing buildings, renewable energy is to be used if this is technically feasible and results in no more than 5% additional costs over the life cycle compared with a fossil replacement (Source: Canton of Zurich, heating replacement (in German)).
Canton of Zurich subsidy programme 2026: if an air-to-water heat pump replaces oil, gas or electric heating in an existing building, the subsidy is CHF 2900.– up to 15 kWth, above that CHF 2900.– plus CHF 160.– per additional kWth (no more than 50% of the relevant investment costs). The application must be submitted before work starts (Source: Canton of Zurich, subsidy programme 2026 (in German)). More: Heat pump subsidies.
Official information without guarantee – the requirements of the canton, municipality and federal government are authoritative.
Process
How we work
- 1
Enquiry
Briefly describe the building and the current heating.
- 2
Site visit & sizing
Check the boiler room, heat distribution and location, calculate the heating load.
- 3
Quote
With options and schedule.
- 4
Permit
Notification or building application incl. noise protection certificate.
- 5
Installation
Installation, commissioning and instruction. The electrical connection is provided by the client.
- 6
Maintenance
Servicing as needed or under contract.
FAQ
Questions about: Heat pump on Lake Zurich
Do I need a building permit for a heat pump on Lake Zurich?
In the Canton of Zurich, the notification procedure with the building authority is sufficient for many heat pumps: air-to-water heat pumps installed indoors, outdoor units up to 2 m³ in volume and ground-source heat pumps with borehole probes. In core zones and where townscape or monument protection applies, air-to-water heat pumps installed outdoors still require a permit.
Air-to-water heat pump or ground-source probe – which suits a sloping plot?
That depends on the plot. Air-to-water heat pumps need a suitable location for the outdoor unit and a noise protection certificate; ground-source probes need drilling and a water protection permit. We clarify which option suits during the site visit.
Will a heat pump work with my radiators?
That depends on the required flow temperature and on the building. We check your existing heat distribution during the site visit and discuss what is needed.
Are subsidies available?
Under its 2026 subsidy programme, the Canton of Zurich supports air-to-water heat pumps that replace oil, gas or electric heating in an existing building. The application must be submitted before work starts. Municipalities may have their own programmes; we prepare the documents.
Do you also service existing heat pumps?
Yes. We maintain existing heat pumps – including systems we did not install.
Let’s discuss your project
Call us or write to us – we will get back to you and arrange a site visit.
